Whew, I thought this post would never get done!
I finished this bad boy over a week ago, but we were covered with heavy rain for five days, so natural light was scarce. When the sun finally came out, I was four and a half hours away in Charleston, S.C, for my grandmother's funeral. When I finally got back, it was overcast again, so I had to settle for these pictures. Just know, in natural light conditions during the day, this hallway looks a lot better.
So, remember me talking about the alcove at the end of our back hallway?
Well I really, really wanted to do a herringbone pattern in that alcove. I thought it would add some flair to an otherwise plain hallway.
Measuring the lines and keeping them straight was a challenge. I actually ended up having Mr. Cheddar do it, since math isn't my thing. And our leveler is that short red thing you see on the ledge! It's a miracle these came out straight.